Tel. 937 411 030 · Fax 937 411 265 · cbrossa@cresidusmaresme.com
Els residus municipals 
El Consorci 
El Centre Integral de Valorització de Residus 
Emissions i Energia 
Premsa 
Contacta 
Perfil del Contractant 
Tràmits i gestions 
Avís legal i política de privacitat 
Technical information

General details
 
Size of building
30,000 m2
Total power
8,600 kW
Concessionary company

UTE TEM (Tractaments Ecològics del Maresme)

Concession time period
15 years
Concession start date 
01/01/2010
 
 
MBT plant
 
Capacity
190,000 t/year
Operation days
249 days/year
Operation hours

15 hours/day on weekdays

Number of shifts
2
Maximum hourly capacity
30 t/h

Material recovery efficiency (paper, glass, metal, plastic, etc.)

8,5% input 

Recovered organic matter (MOR) 

40% input 
Maximum combustible waste
55% input
 
 
Waste-to-Energy plant
 
Combustible waste PCI estimate
2,800 kcal/kg
Contract treatment capacity
140,000 t/year
Number of lines
2
Combustion system

Reverse-acting grate

Unit thermal capacity
24,000,000 kcal/h

Unit mechanical capacity (PCI 2,800 kcal/kg)

8.57 t/h
Unit steam generation ratio
30.2 t/h
Steam pressure
 
 
Boiler
67 bar
 
Superheater
62.5 bar
 
Turbine
61 bar
Steam temperature
 
 
Boiler
283 ºC
 
Superheater
385 ºC
 
Turbine
380 ºC
 
 
 
Gas treatment system

NOx reduction SNCR (Selective Non Catalytic Reduction) type with urea in combustion chamber

 
Semi-dry absorber
 
Dry contact reactor
 
Active carbon injection
 
Fabric filters
 
NOx reduction SCR (Selective Catalytic Reduction) type with ammonia
 
 
Condensation type
Air-cooled condensers
Generation power
13.55 MW (11.25 MW+2.3 MW)
Energy production
115,000 MWh/year
Energy self-consumption
30,000 MWh/year
Electricity sold
85,000 MWh/year
Energy generation ratio
820 kWh/t MSW
Carrer de la Teixidora, 83, 08302 Mataró (Barcelona)
Tel. 937 411 030 · Fax 937 411 265
cbrossa@cresidusmaresme.com

[Web creada per Duma Interactiva]